5CrNiMoV / AISI 6F3 / DIN 1.2714 Hot Mould Steel
- MOQ: 1-2tons
-Packing detail: raw packing or according to customer’s requirement
-Delivery detail: within 30 days after order confirmed
-Payment term: T/T, L/C at sight
-Brand name: KaiXin
-Delivery condition: hot rolled / forged, machined / black surface
-Specification(mm):round bar:Dia.60-800 flat bar: 25-400/200-800
The Basic Information of 5CrNiMo
Chemical Composition:
C | Cr | Si | Mn | P | S | Ni | Mo | V |
0.50-0.60 | 0.80-1.10 | ≤0.35 | 0.50-0.80 | ≤0.03 | ≤0.03 | 1.40-1.80 | 0.35-0.50 | 0.10-0.30 |
Mechanical Properties:
-hardness: Annealing 197-241HB
Delivery Condition & Surface Treatment:
-hot rolled / forged steel in annealing state
-polishing and grinding before delivery or just original
Heat Treatment:
-Quenching temperature:890-910℃,
-Cooling in oil, hardness61.5HRC
-Tempering temperature: 420-550℃
-double tempering, hardness38-47HRC
Applications: Because of the excellent harden ability, wear resistance and high strength; it is usually used to manufacture various types of large and medium-sized forging die.
Packaging & Delivery
Packaging Details: | Suitable for transportation |
Delivery Detail: | During 45 days after contract |
Equivalent Grades
GB | DIN | AISI | JIS |
5CrNiMoV | 1.2714 | L6 | SKT4 |
Chemical Composition
C | Si | Mn | Cr | P | S | V | Ni | Mo |
0.50-0.60 | 0.10-0.40 | 0.65-0.95 | 1.0-1.2 | ≤0.03 | ≤0.03 | 0.07-0.12 | 1.50-1.80 | 0.45-0.55 |
Available Size
Round steel bar Diameter 16-800mm |
flat steel bar 16-400mm*100-800mm |
Surface Condition
Black surface/ Grinded/ Machined |
Hardness
HBS 248MAX |
Characteristics
Forged Tool Steel 5CrNiMoV is of high plasticity, good hardenability, good tenacity and strength, with great wear resistance |
Applications
Forged Tool Steel 5CrNiMoV is for making forging dies,hot shear knives,punches,backing plate,die holders,hot punching tools |
Heat Treatment
Isothermal annealing | Heat to 800°Cand hold at temperature for 1/2 h to 1 h; |
Stress relieving | To be carried out after maching before the final heat treatment. |
Hardening | Initial preheating to 350-450°C; |
Tempering | Tempering must be carried out within one hour from hardening(warm part) in |
Production Process
OUR MAIN PRODUCTS
Hubei Kaixin Supply Chain Management Co., Ltd.
TEL :+8618272169977 ; 0714-6510168
FAX:0714-6519746
Email:info@hubeikaixin.com
Add:No.37 Huahu Ave Huahu Street.Huangshi City Hubei
Code:435000
web:www.kxdiesteel.com